Sentinel-2 : all sites available

All the sites that had been selected by Theia for the production of Sentinel-2 Level 2A products are now in production within Muscate.

The number of tiles processed each days often tops 400. Only a couple of sites need a few more days to be completed.

Given we have some production margins, we are going to add 200 tiles in Europe : Spain, Portugal, Italy, Netherlands, Belgium, Luxembourg, Switzerland, and small parts of Germany and Austria will be included in Theia’s production. The new tiles, which appear in red in the map, will be available in August, starting from images acquired in December 2016. We are also talking with other partners to generalize MAJA processing over Europe.

For more information see cesbio.ups-tlse.fr/multitemp

More information: Sentinel-2

More news

PhD & PostDoc

[POST-DOC] INFORMATION CONTENT OF REMOTE SENSING SOIL MOISTURE RETRIEVALS FOR WATER RESOURCES AND AGRICULTURAL MANAGEMENT

Join Rennes GeoScience and Montpellier Tetis team for a 24-months post-doc. Theia BOSCO projct related content.

10.05.2021

Agenda

MACLEAN’21 Call for proposal

Submit your proposal before June, 23, 2021.

04.05.2021

Jobs

ENGINEER POSITION FOR LARGE-SCALE LAND-COVER MAPPING

New open position at @CesbioLab for the development of large scale satellite image time series, with iota2

27.04.2021

Search