Spot 5 (Take 5) is getting ready

The Spot 5 (Take 5) project, lead by Sylvia Sylvander at Cnes et Bianca Hoersch at ESA is getting ready and the first pictures will be taken in april 2015.

Spot 5 ends its operational life on March the 31st and the orbit change manoeuvre should take place on April the Second. Then a first image will be taken to check that all the processing works, as we did for Spot 4 (Tak e5). The first acquisitions will be programmed for the 8th of April.

The ground processing software preparation has started with the Theia Cnes team, with support from Cap Gemini and Cesbio. Mireille Huc, at Cesbio, just released the new version of MACCS prototype, which will handle the Spot 5 (Take 5) data.

Spot 5 (Take 5) agenda detail on www.cesbio.ups-tlse.fr

More information: 

More news

[PhD] Spatio-temporal dynamics of suspended particulate matter in the estuary/coastal sea continuum

Thesis project aiming to integrate and interact high-frequency in situ data (COAST-HF, SYNAPSES) with water color satellite data (Sentinel 2/3 – Landsat – MODIS) to enhance our understanding of the land-sea interface.

Two THEIA LiDAR tools for forest monitoring

On this International Day of Forests, for which innovation has a major role to play in 2024, we are highlighting two tools dedicated to the management of aerial LiDAR data […]

SWOT data that exceeds expectations

The SWOT space mission was launched at the end of 2022 by CNES and NASA to document the water masses of the entire planet – oceans and continental waters. Data […]

Search